Mars Exploration Rover Landing Site Selection
Selection of the landing sites for the Mars Exploration Rovers has involved over 2 years of research and analysis effort that has included the participation of broad sections of the planetary sciences community through a series of open landing site workshops. The effort has included the definition of the engineering constraints based on the landing system, mapping those engineering constraints into acceptable regions and prospective sites, the acquisition of new information from Mars Global Surveyor and Mars Odyssey orbiters, the evaluation of science and safety criteria for the sites, and the downselection and final site selection based on the sites science potential and safety. The final landing sites (Meridiani Planum and Gusev crater) were selected by NASA Headquarters on April 11, 2003, prior to launch in June. This paper presents engineering requirements, and potential landing sites for Mars Exploration Rovers.
Related Mars Exploration Documents
1999 Marsokhod Field Experiment: A Simulation of a Mars Rover Science Mission
A field experiment to simulate a rover mission to Mars was performed in February 1999. This experiment, the latest in a series of rover field experiments, was designed to demonstrate and validate tech
A Compact Tensegrity Lander and Rover Concept for Exploration of Martian Terrains
The proposed concept is a redesign of the Tension Adjustable Network for Deploying Entry Membrane (TANDEM) tensegrity rover for a low-cost mission to Mars. Focus is on the entry, descent, landing, and
A conceptual design and operational characteristics for a Mars rover for a 1979 or 1981 Viking science mission
The feasibility of a small Mars rover for use on a 1979 or 1981 Viking mission was studied and a preliminary design concept was developed. Three variations of the concept were developed to provide com