International Space Station Satellite Deployment: Jettison Policy and Best Practices for Satellite Payload Developers
The International Space Station Systems Engineering and Integration Office is responsible for the Multilateral International Space Station (ISS) and ISS Visiting Vehicle Jettison Policy, the Partner Program Directive on jettisoning objects from the ISS and Visiting Vehicles to/from the ISS.
Related Space Station Documents
A Historical Review of Logistics Mass and Crew Time Demands for ISS Operations
Following over 20 years of continuously crewed operations on the International Space Station (ISS), NASA is planning to return to the Moon and eventually send humans to Mars. ISS operations provide vi
Acceleration Environment of the International Space Station
Measurement of the microgravity acceleration environment on the International Space Station has been accomplished by two accelerometer systems since 2001. The Microgravity Acceleration Measurement Sys
Accomplishments in Bioastronautics Research Aboard International Space Station
The seventh long-duration expedition crew is currently in residence aboard International Space Station (ISS), continuing a permanent human presence in space that began in October 2000. During that tim