Space Shuttle Program Manifest Process & Flight Opportunities for Small Payloads
The Space Shuttle Program has, since the early flights, exerted great effort to maximize the cargo complement for each individual mission. Historically, because of the capabilities of the Space Shuttle, there have almost always been opportunities to fly what are termed secondary payloads on every mission. However, with the challenges associated with assembling the International Space Station, accommodations for secondary payloads are significantly limited. In an attempt to deal with this situation, the Space Shuttle Program has developed techniques that will identify and utilize flight opportunities, as well as policies that may create opportunities.
Related Space Shuttle Documents
A Compilation of Space Shuttle Sonic Boom Measurements
Sonic boom measurements have been obtained on 26 flights of the Space Shuttle system beginning with the launch of STS-1 on April 12, 1981, to the reentry-descent of STS-41 into EAFB on Oct. 10, 1990.
A high angle of attack inviscid shuttle orbiter computation
As a preliminary step toward predicting the leeside thermal environment for winged reentry vehicles at flight conditions, a computational solution for the flow about the Shuttle Orbiter at wind tunnel
A radiant heating test facility for space shuttle orbiter thermal protection system certification
A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orb