Space shuttle performance capabilities, revision 1
The space shuttle performance capabilities and proposed space shuttle missions are discussed. The performance requirements of the space shuttle are described in terms of three reference missions. Mission requirements are defined by spacecraft or net payload weight and by orbital specifications or space destination. The predicted performance of various space shuttle configurations are analyzed.
Related Space Shuttle Documents
A Compilation of Space Shuttle Sonic Boom Measurements
Sonic boom measurements have been obtained on 26 flights of the Space Shuttle system beginning with the launch of STS-1 on April 12, 1981, to the reentry-descent of STS-41 into EAFB on Oct. 10, 1990.
A high angle of attack inviscid shuttle orbiter computation
As a preliminary step toward predicting the leeside thermal environment for winged reentry vehicles at flight conditions, a computational solution for the flow about the Shuttle Orbiter at wind tunnel
A radiant heating test facility for space shuttle orbiter thermal protection system certification
A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orb