Space shuttle flight readiness firing dress rehearsal for STS-1
The static firing of the Space Shuttle Main Engine in preparation for the launch of the Enterprise Orbiter is discussed. The following were also tested: structures and mechanics; thermal design integration; propulsion and power; avionics and software; guidance, navigation, and control; mechanical systems; communications and tracking; and integrated ground systems.
Related Space Shuttle Documents
A Compilation of Space Shuttle Sonic Boom Measurements
Sonic boom measurements have been obtained on 26 flights of the Space Shuttle system beginning with the launch of STS-1 on April 12, 1981, to the reentry-descent of STS-41 into EAFB on Oct. 10, 1990.
A high angle of attack inviscid shuttle orbiter computation
As a preliminary step toward predicting the leeside thermal environment for winged reentry vehicles at flight conditions, a computational solution for the flow about the Shuttle Orbiter at wind tunnel
A radiant heating test facility for space shuttle orbiter thermal protection system certification
A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orb