Space shuttle external tank performance improvements: The challenge
The external tank (ET) has been actively involved in performance improvements since the inception of the space shuttle program, primarily by weight savings. Weight savings were realized on the first block of flight articles (standard weight tank). With a need for further performance improvements, the ET Program Office was requested to develop a program to reduce tank weight an additional 6000 lb and schedule delivery of the first lightweight ET (LWT) for June 1982. The weight savings program was accomplished by: (1) a unique approach to use of factors of safety; (2) design optimization; and (3) redesign of structures with large margins of safety which resulted in an actual weight savings of 7294 lb. Additional studies have identified further weight savings which are to be implemented at appropriate times in production flow. Examples are an improved thermal protection system for the LH2 tank aft dome and reduction of slosh baffles in the LO2 tank based on flight data. All performance improvements were compared and selected based on non-recurring and recurring cost and technical risk.
Related Space Shuttle Documents
A Compilation of Space Shuttle Sonic Boom Measurements
Sonic boom measurements have been obtained on 26 flights of the Space Shuttle system beginning with the launch of STS-1 on April 12, 1981, to the reentry-descent of STS-41 into EAFB on Oct. 10, 1990.
A high angle of attack inviscid shuttle orbiter computation
As a preliminary step toward predicting the leeside thermal environment for winged reentry vehicles at flight conditions, a computational solution for the flow about the Shuttle Orbiter at wind tunnel
A radiant heating test facility for space shuttle orbiter thermal protection system certification
A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orb