Sonic boom measurement test plan for Space Shuttle STS-2 reentry
Procedures and system specifications associated with the space shuttle STS-2 sonic boom measurement program are described. Specifically included are details such as mobile data acquisition station locations, measurement systems calibration levels, predicted sonic boom overpressure levels, overpressure level assignment for each data acquisition station, data recording times on and off, universal coordinate time, and measurement system descriptions.
Related Space Shuttle Documents
A Compilation of Space Shuttle Sonic Boom Measurements
Sonic boom measurements have been obtained on 26 flights of the Space Shuttle system beginning with the launch of STS-1 on April 12, 1981, to the reentry-descent of STS-41 into EAFB on Oct. 10, 1990.
A high angle of attack inviscid shuttle orbiter computation
As a preliminary step toward predicting the leeside thermal environment for winged reentry vehicles at flight conditions, a computational solution for the flow about the Shuttle Orbiter at wind tunnel
A radiant heating test facility for space shuttle orbiter thermal protection system certification
A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orb