Estimating Orion Heat Shield Failure Due To Ablator Cracking During The EFT-1 Mission
The Orion EFT-1 heatshield suffered from two major certification challenges: First, the mechanical properties used in design were not evident in the flight hardware and second, the flight article itself cracked during fabrication. The combination of these events motivated the Orion Program to pursue an engineering-level Probabilistic Risk Assessment (PRA) as part of heatshield certification rationale. The PRA provided loss of Mission (LOM) likelihoods considering the probability of a crack occurring during the mission and the likelihood of subsequent structure over-temperature. The methods and input data for the PRA are presented along with a discussion of the test data used to anchor the results. The Orion program accepted an EFT-1 Loss of Vehicle (LOV) risk of 1-in-160,000 due to in-mission Avcoat cracking based on the results of this analysis. Conservatisms in the result, along with future considerations for Exploration Missions (EM) are also addressed.
Related Artemis Documents
A Comparison of ARTEMIS Data with the Lunar Plasma Design Environment for NASA Crewed Missions
NASA’s Gateway will provide the capability for sustaining a human presence in cis-lunar space. Operations of the Gateway will include spacecraft dockings, extra vehicular activities (EVA), and high-po
A Comparison of ARTEMIS Observations and Particle-in-cell Modeling of the Lunar Photoelectron Sheath in the Terrestrial Magnetotail
As an airless body in space with no global magnetic field, the Moon is exposed to both solar ultraviolet radiation and ambient plasmas. Photoemission from solar UV radiation and collection of ambient
A Distributed Simulation Framework Applied to Artemis Analysis, Studies, Integration, and Test
The National Aeronautics and Space Administration (NASA) established the Artemis Program, a series of missions to return humans to the Moon and explore further than before. To execute the Artemis miss