Development and Qualification of Alternate Blowing Agents for Space Shuttle External Tank Thermal Protection System
The Aerospace industry has a long history of using low density polyurethane and polyurethane-modified isocyanurate foam systems as lightweight, low cost, easily processed cryogenic Thermal Protection Systems (TPS) for ascent vehicles. The Thermal Protection System of the Space Shuttle External Tank (ET) is required so that quality liquid cryogenic propellant can be supplied to the Orbiter main engines and to protect the metal structure of the tanks from becoming too hot from aerodynamic heating, hence preventing premature break-up of the tank. These foams are all blown with CFC-1 I blowing agent which has been identified by the Environmental Protection Agency (EPA) as an ozone depleting substance. CFCs will not be manufactured after 1995, Consequently, alternate blowing agent substances must be identified and implemented to assure continued ET manufacture and delivery. This paper describes the various testing performed to select and qualify HCFC-1 41 b as a near term drop-in replacement for CFC-11. Although originally intended to be a one for one substitution in the formulation, several technical issues were identified regarding material performance and processability which required both formulation changes and special processing considerations to overcome. In order to evaluate these material changes, each material was subjected to various tests to qualify them to meet the various loads imposed on them during long term storage, pre-launch operations, launch, separation and re-entry. Each material was tested for structural, thermal, aeroshear, and stress/strain loads for the various flight environments each encounters. Details of the development and qualification program and the resolution of specific problems are discussed in this paper.
Related Space Shuttle Documents
A Compilation of Space Shuttle Sonic Boom Measurements
Sonic boom measurements have been obtained on 26 flights of the Space Shuttle system beginning with the launch of STS-1 on April 12, 1981, to the reentry-descent of STS-41 into EAFB on Oct. 10, 1990.
A high angle of attack inviscid shuttle orbiter computation
As a preliminary step toward predicting the leeside thermal environment for winged reentry vehicles at flight conditions, a computational solution for the flow about the Shuttle Orbiter at wind tunnel
A radiant heating test facility for space shuttle orbiter thermal protection system certification
A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orb