Automation of Hubble Space Telescope Mission Operations
On June 13, 2011, after more than 21 years, 115 thousand orbits, and nearly 1 million exposures taken, the operation of the Hubble Space Telescope successfully transitioned from 24x7x365 staffing to 815 staffing. This required the automation of routine mission operations including telemetry and forward link acquisition, data dumping and solid-state recorder management, stored command loading, and health and safety monitoring of both the observatory and the HST Ground System. These changes were driven by budget reductions, and required ground system and onboard spacecraft enhancements across the entire operations spectrum, from planning and scheduling systems to payload flight software. Changes in personnel and staffing were required in order to adapt to the new roles and responsibilities required in the new automated operations era. This paper will provide a high level overview of the obstacles to automating nominal HST mission operations, both technical and cultural, and how those obstacles were overcome.
Related Space Telescopes Documents
25 Years of Contamination Control on the James Webb Space Telescope
The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performe
A Catalog of Kepler Habitable Zone Exoplanet Candidates
The NASA Kepler mission ha s discovered thousands of new planetary candidates, many of which have been confirmed through follow-up observations. A primary goal of the mission is to determine the occur
A Mechanical Cryogenic Cooler for the Hubble Space Telescope
This paper presents a description of the Hubble Space Telescope (HST) Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) Cryo Cooler (NCC), the cutting edge technology involved, its evolution