An Overview of the James Webb Space Telescope (JWST) Project
The JWST project at the GSFC is responsible for the development, launch, operations and science data processing for the James Webb Space Telescope. The JWST project is currently in phase B with its launch scheduled for August 2011. The project is a partnership between NASA, ESA and CSA. The U.S. JWST team is now fully in place with the selection of Northrop Grumman Space Technology (NGST) as the prime contractor for the telescope and the Space Telescope Science Institute (STScI) as the mission operations and science data processing lead. This paper will provide an overview of the current JWST architecture and mission status including technology developments and risks.
Related Space Telescopes Documents
25 Years of Contamination Control on the James Webb Space Telescope
The James Webb Space Telescope (JWST) has actively been in process since 1996, and at last, on Christmas Day 2021, it launched. This launch was the fulfillment of an astounding level of work performe
A Catalog of Kepler Habitable Zone Exoplanet Candidates
The NASA Kepler mission ha s discovered thousands of new planetary candidates, many of which have been confirmed through follow-up observations. A primary goal of the mission is to determine the occur
A Mechanical Cryogenic Cooler for the Hubble Space Telescope
This paper presents a description of the Hubble Space Telescope (HST) Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) Cryo Cooler (NCC), the cutting edge technology involved, its evolution